Construction Project Management

ITM is the absolute leader in CM for large-scale national construction projects.

We have perfectly implemented the functional effects of CM by successfully leading a number of large-scale national construction projects,
and provide maximum value to our clients with the best experts in each field and an innovative management system.

Management System

  • Design Management

    Design Management

    Integrated coordination and optimal decision-making support for each design stage linking construction cost with function and quality

    Facility planning optimization management through simulation such as design analysis and performance inspection

  • Quality Management

    Quality Management

    Achieving high-quality and flawless results through customized quality innovation activities by ISO 9001 (Quality Management System)

    Operation of quality innovation system linked with I-CIS-based sites and headquarters

  • Cost Management

    Cost Management

    Maximize investment value by analyzing construction costs by project cost experts and reducing costs through strategic VE

    Operation of BIM-based cost and schedule integrated management system

  • Safety Management

    Safety Management

    Enhanced safety management system based on ISO 45001 (Safety Management System) and smart safety technology management

    About 90 safety experts' work-linked activities centered on the safety control tower

  • Schedule Management

    Schedule Management

    Suggesting step-by-step schedule reduction plans to complete projects in the shortest and timely manner and preemptively preventing delay risks

    BIM-based integrated schedule cost management system operation

  • Contract/Claim Management

    Contract/Claim Management

    Prevention of contract risk and active response to claims with the priority of protecting customer rights and interests

    Project delivery support and management related to the selection of project participants

CM Effects

  • Reduced
    construction risk

  • 5~10% Project
    cost reduction

  • Shortest period,
    shorter project schedule

  • Securing maximum
    quality at minimum cost

  • Prevention of
    claims and disputes

Major Tasks of CM by Project Stage

  • Risk Prevention
  • Cost Saving
  • Time Reducing
  • Improving Quality
    • Planning Stage
    • Project feasibility review

      Determining the optimal business method

    • Establishment of budget and execution plan

      Cash flow review

    • Master Schedule review and establishment

    • Setting quality target levels and standards

    • Design Stage
    • Designer selection management

      Inspection of planned change factors and laws and regulations and measures

    • Prediction and control of construction cost by design stage

      Value Engineering

    • Design progress management

      Timely authorization and permission support

    • Suggestion of design guides tailored to required quality

      Design review and improvement

    • Delivery Stage
    • Pre-management of delivery plan

      Construction contract review

    • Determination of bidding method and criteria centered on client interests

    • Timely construction company selection through order administration management

    • Preparation of quality guidelines

      Bidder quality plan evaluation

    • Construction Stage
    • Prediction and response to claims and dispute factors

      Design change management

    • Integrated management of process and construction costs

      Confirmation and management of ready-made amount

      Construction VE

    • Milestone management

      Review of construction period reduction plan

      Prediction and response to construction delay

    • Construction quality monitoring

      Suggestion of quality improvement plan

    • Post-construction Stage
    • Post-construction evaluation and construction contract termination management

    • Post-construction evaluation and settlement

    • Deploying a prompt operating environment

    • Technical support for defect repair

      Preparation of maintenance manual

Pre-Con CM

  • Since the key issues for project success are determined during the planning and design process of a construction project, it is necessary to introduce CM from the initial stage.
  • ITM presents the maximum potential for cost reduction, construction period reduction and quality improvement through differentiated Pre-Con CM service.